The court
- Galvanised steel structure
- 10 or 12 mm tempered glass
- Synthetic turf
- Net and posts
- LED lighting
- Shipping and installation
- Preventive and corrective maintenance
One contract, one point of contact, a price you know in advance.
We build, finance and maintain your courts. Nothing to pay for the court at signing, groundwork quoted separately — your capital stays free for the next site.

Group figures, from our European projects. They describe what has been delivered to date, not a promise about your site.
Hotel groups, open-air hospitality operators and padel clubs. The same offer behind a single court and behind a fleet spread over a dozen sites.














Also equipped Club Med · Accor, and independent clubs across Europe.
Four steps, one point of contact. Allow around three months between the site visit and opening day.
Measurements, ground, access, power. We tell you straight away whether the site works — and if it does not, we say so.
Excavation, slab, drainage, power. Every line priced before anyone starts digging.
Structure, glass, turf, net, lighting. Four to five days per court, one crew.
Court handed over and checked against the FIP rules. You start taking bookings.
Playing surface to FIP rules. What changes between models is the glass, the turf and the lighting — never the dimensions.
One contract, one point of contact, a price you know in advance.
Priced line by line. Paid when the work is done.
See the cost breakdown →Turf care, structural checks, lighting, wear parts. Every court is kept at playing standard throughout the lease period — no service agreement to negotiate on the side, and no line that appears in year three.
The question is not what a court costs. It is what is left afterwards for the next site.
~$0
Your cash is locked in glass and turf. It comes back over years, one booking at a time, and not before.
100%
Redeployed where it compounds: the clubhouse, food and beverage, staff, and getting the next site open.
Every dollar you raised should buy growth, not glass and turf.
Two settings, and you have your rent.
Galvanised steel frame, 10 mm tempered glass, 12 mm monofilament turf.
Estimate. Your quote depends on the site and on financing approval.
from 214 reviews
We opened ten courts across three sites in the same year. Buying them, we would have managed two.
Four courts installed in twelve days. The crew showed up with everything, we had nothing to manage.
I had three suppliers quote it. The only one who told me plainly what was not in the price.
Two courts, open in eleven weeks. Saturday morning slots alone cover the rent.
Six indoor courts. Three years on, the structure has not moved and we have only just changed the turf.
We went from two courts to eight in eighteen months without ever touching our cash.
A tennis club converting two courts and a hotel adding one are not buying the same thing. The quote should not pretend otherwise.
Tell us how many courts and where. You get a full quote — court rent and groundwork, separated — usually within one business day.
We load Google Analytics only if you accept. The simulator and everything else on this site work either way. What we store.